Instrumentation Hardware Tasks
Task Title Staff W1 W2 W3 W4 W5 W6 W7 W8 S1 S2 S3 S4 S5 S6 S7 S8 Reports/Notes
Reset Box Installation JR/ER/JC
C
 C  C  C  C  C  C  C  C  C  C  C  C  C  C  C
Reset Box Field Confirmation JR/DI                                 Wiring Diagram
ISCO Cable Modification DI/CB  
C ?
C ?
 C ?
C ?
                     
ISCO Cable Replacement & Testing DI/CB/JR                                
Offset Check (May 15, 1999) JR  C  C  C  C  C  C  C  C  C  C  C  C  C  C  C  C
Stilling Well Step Test  JR/JC                                  StepTest.pdf
Ponded Flume Elevation Measurements JR/JC                                
Collection Ditch and Canal Stage Data JR/JC                                
Ground Water Well Installation                                  
Ground Water Well Instrumentation