Work Assignments
for MAERC Techs (Jorge Rodriguez and Greg Huey)
for the stock rate experimental plots
Updated:  05/10/00
Task ID Task Title
Date
Requested
Days Since
Request
Date
Completed
Completion Report w1 w2 w3 w4 w5 w6 w7 w8 s1 s2 s3 s4 s5 s6 s7 s8 Misc.
052
Down encoders read -99999
04/03/00
37 
       I    
I
 
I
   
I
 I    I      
I
 
051
Power Failure
03/30/00
 03/30/00  maint000329        C                          
050
clear SOP addressing SS
03/24/00
47
     I  I  I  I  I  I  I  I  I  I  I  I  I  I  I  I  
049
follow up with SFWMD 
03/24/00
47
   
I
 I  I  I  I  I  I  I  I  I  I  I  I  I  I  I  
048
Encoder Corrosion
03/17/00
54
   
I
 I  I  I  I  I  I  I  I  I  I  I  I  I  I  I  
047
problem occured
03/13/00
58
                 
I
                 
046
reset button
03/01/00
70
                                 
I
 
045
no liquid detected
03/01/00
70
                               
I
   
044
 missed sample
03/01/00
70
                               
I
   
043
no liquid detected
03/01/00
70
                               
I
   
042
 first three samples  missed
03/01/00
70
                               
I
   
041
asterisk flashing
03/01/00
70
                               
I
   
040
no liquid detected
03/01/00
70
             
I
                     
039
 one sample missed
03/01/00
70
             
I
                     
038
asterisk was flashing
03/01/00
70
             
I
                     
037
 reset button
03/01/00
70
                 
I
                 
036
no liquid detected
03/01/00
70
                 
I
                 
035
 nine samples missed
03/01/00
70
                 
I
                 
034
no liquid detected
03/01/00
70
             
I
                     
033
 two samples missed
03/01/00
70
             
I
                     
032
asterisk was flashing
03/01/00
70
             
I
                     
031
install station clocks
01/06/99  418 02/28/00  maint000510
C
C
C
 C
C
C
C
C
C
C
C
C
C
C
C
C
 
030 visual staff gauge *  ?     I I I I I I I I I I I I I I I I  
029 add digital clocks 12/07/99 83 02/28/00 maint000510 C C C C C C C C C C C C C C C C  
028 ditch re-grading 12/07/99 155         I                           photo
027 ditch weeds removal 12/07/99 155         I             I I           photo
026 cable/wire problem 12/07/99 83 02/28/00 pending report         C                       photo
025 conduit connections 12/07/99 28  01/04/00 maint000104        C           C             photo
024 replace ISCO hose 12/07/99  3 12/10/99 maint991210 C C C C C C C C C C C C C C C C photo
023 refinish flume coating *  ?  02/12/00 maint000212 C C
C
C C C C C C C C C C C C C photo
022 ISCO chains 12/07/99  7  12/15/99 maint991215 C C C C C C C C C C C C C C C C photo
021 flume weeds removal 12/07/99 29  01/04/00 maint000104 C C     C   C C                 photo
Task ID Task Title Date
Requested
Days Since
Request
Date
Completed
Completion Report w1 w2 w3 w4 w5 w6 w7 w8 s1 s2 s3 s4 s5 s6 s7 s8 Misc.
020 clean solar panel 12/07/99  7  12/15/99  maint991215 C C C C C C C C C C C C C C C C photo
019 clean flume surfaces 12/07/99 83  02/28/00  maint000510 C C C C C C C C C C C C C C C C photo
018 clean encoder shelter 12/07/99 155     I I I I I I I I I I I I I I I I photo
017 clean rain gauge 12/07/99  7 12/15/99 maint991215 C           C     C         C   photo
016 clean ISCO strainer 12/07/99  3
12/10/99
maint991210 C C C C C C C C C C C C C C C C photo
015 grind lips down 12/07/99 155                       I     I   I   photo
014 shelter box sealing 12/07/99 155     I I I I I I I I I I I I I I I I photo
013 CR10 Programs 12/07/99 19
 12/28/99
 maint991228 C C C C C C C C C C C C C C C C  
012 Check Encoders 12/02/99 453                 I         I           
011 Analysis Page 11/22/99 170